A Polar & Atlas Air Virtual Airline

Globe Cargo News

Realism Project

Today we are excited to introduce the Realism Project. 

You may recall that some time ago we closed Titan Charters citing our desire to get our operation back to something more realistic. The Realism Project is a large part of obtaining that goal.

The Realism Project is a multi-phase development process. The phases range in amount of realism added and complexity of development. The phases and major development features are: 

  • Phase 1: Proposed January 1, 2025. Estimated January 1, 2025 

    • Pilot Manual update requiring reports in specific circumstances. 

 
  • Phase 2: Proposed TBD, Estimated TBD 

    • Developing a Flight Operations Manual (FOM), using FAA required chapters. The FOM will replace the Pilot Manual.

    • Flight Release training. 

  •  
  • Phase 3: Proposed TBD, Estimated TBD 

    • Systems training for each aircraft type. 

    • Flight Operation Quality Assurance (FOQA) 

      • FOQA is a real-world program that downloads Flight Data Recorder data from as many flights as possible (we will have a 100% capture rate). This data is de-identified and used only for trend monitoring. This means that we can detect areas of most needed improvement which can change over time. 

  • Phase 4: Proposed TBD, Estimated TBD 

    • Type Ratings 

    • Company Flight Manual (CFM) for each aircraft type 

As you can see, all phases except Phase 1 have “To Be Determined” timelines. Once a phase is complete, we will begin developing the next phase. Once into the development of the next phase we will have a better idea of how long it takes to complete it and update the proposed and estimated dates. 

Preparations will begin soon for Phases 2-4 to include some volunteer postions. Watch future news articles for information about positions when they are posted. 

We will keep you updated on development progress during each phase of the project. 

(3)    (0)